Skip to main content

Deployment Operations

Guides for deploying 4626 infrastructure.

Guides

GuideDescription
Ship ChecklistOne ordered path from current state to launch
Pre-LaunchPre-launch checklist
CCA VerificationVerify CCA deployment
Solana OVault Canary RolloutOVault preflight rollout + kill switch
Infra Epoch RedeployFull registry/batcher/store redeploy
v1.8.3 Mainnet Release PacketCanonical release target for the current bytecode epoch and cutover plan
v1.8.1 Mainnet Release PacketPlanned vanity-epoch addresses, salts, cutover, rollback
v1.8.1 Pre-Broadcast ChecklistOperator checklist before broadcasting the vanity epoch
v1.7.1 Mainnet Release PacketCanonical addresses, env cutover, verification, rollback
v1.7.1 Post-Broadcast ChecklistAddress/tx confirmation and explorer verification status
Cleanup Baseline 2026-04-09Repo cleanup marker, short changelog, and verification snapshot
Approvals ChecklistRequired approvals
CREATE2 RegistryDeterministic deployments
Eliza RuntimeXMTP runtime deploy/rollback/triage runbook

Multisig

GuideDescription
Multisig GuideUsing Safe multisig
DeploymentDeploy with multisig
Owner SetupConfigure ownership